Contact Us

Use the form on the right to contact us.

You can edit the text in this area, and change where the contact form on the right submits to, by entering edit mode using the modes on the bottom right. 

         

123 Street Avenue, City Town, 99999

(123) 555-6789

email@address.com

 

You can set your address, phone number, email and site description in the settings tab.
Link to read me page with more information.

Projects

SPK Engineering's past projects

Filtering by Category: District 8

S.R. 0934 Section 004

Michael Kilgore

After

After

Before

Before

After

After

After

After

Cost: $2.9 Million
Client: PennDOT District 8-0
Contact: Mr. Doug Murphy (717-783-3773)
Project Letting: Scheduled 2015

Superstructure Replacement Project in Lebanon County - The existing bridge was a single span steel thru-girder bridge over two active lines of Norfolk Southern Railroad. Traffic needed to be maintained on the existing roadway so SPK studied methods to replace a thru-girder bridge in half-widths, concluding with a design for a steel girder support beam placed near the deck cut line with hangars detailed to support the severed floorbeams. The grade was being increased as well to improve the railroad underclearance.

 

S.R. 4010 Section 010

Michael Kilgore

Final

Before

Final

Final

Cost: $0.53 million
Client: PennDOT District 8-0
Contact: Mr. Ben Singer, P.E. (717-787-6690)
Project Letting: January 2016

Edenville Road Bridge - This project included a single span (41.4’ c/c brgs.) prestressed concrete spread box beam bridge with conventional abutments. The project also included 1,559’ of approach roadway construction.

B-465A & B-465 Mileposts 197.19 & 197.20

Michael Kilgore

Project Cost: $5 Million
Project Length: 0.38 Mile
Client: Pennsylvania Turnpike
Contact: Brad Updegrave, P.E., (717-939-9551 x-3675)

(Bridge Replacement) - Franklin County - This project includes the replacement of two (2) separate bridges carrying S.R. 4006 (Cold Springs Road) over the eastbound and westbound Pennsylvania Turnpike with a two-span continuous curved-steel plate girder bridge (344’ total span). The roadway was realigned to permit uninterrupted traffic on S.R. 4006 throughout construction. The project also includes high-mast lighting, drainage, temporary lighting, and traffic control provisions on the Turnpike for demolition
and erection activities. The design team included Earth, Inc.  
 

Finished Project 4/30/07

Finished Project 4/30/07

Finished Project 4/1/07

Finished Project 4/1/07

 

Girder Erection
10.16.06

Girder Erection 10/16/06

Girder Erection 10/16/06

Girder Erection 10/16/06

Girder Erection 10/16/06