SPK Engineering's past projects

Filtering by Tag: Roadway Reconstruction

S.R. 0011, Sections 114/115 & SR 0487, Section 100

Michael Kilgore

Cost: $6.8 million
Client: PennDOT District 3-0
Contact: Justin Gochenauer, P.E. (717-221-2010)
Project Letting: September 17, 2020

Bloomsburg Reconstruction Project - Columbia County - This project consists of 1.371 miles of urban arterial roadway resurfacing/reconstruction, drainage and guide rail updates, pedestrian facility improvements, retaining walls, intersection safety improvements including new traffic signals, roadway lighting and parking meters, and other miscellaneous items.

S.R. 0764 Section 20B

Michael Kilgore

After

After

Before

Before

After

After

Cost: $2.094 Million
Client: PennDOT Engineering District 9-0
Contact: Ms. Tracey Farabaugh, P.E. (814-696-6841)
Project Letting: January 2016

Blair County -  This project included the phased replacement of a deteriorated single span concrete T-beam bridge over Sandy Run with a single span spread box beam bridge (76.0’ c-c brgs.). The project also included 2,898’ of approach roadway construction.

S.R. 1006, Section 450

Michael Kilgore

After

After

After

After

Cost: $3.04 million
Client: Engineering District 10-0
Contact: Mr. Jason Layman (724-357-7614)
Project Letting: August 2014

Indiana County - This project included the phased total replacement of a deteriorated four span steel girder bridge with inadequate underclearance with a two span continuous fabricated steel girder bridge (230’ total length) with minimal profile grade adjustment. The bridge carries S.R. 1006 (Airport Road) over four lanes of S.R. 0119. The project also included 370’ of approach roadway reconstruction.