S.R. 0022 Section 032
Michael Kilgore
Cost: $1.6 million
Project Length: Approximately 510 Feet
Client: PennDOT Engineering District 9-0
Contact: Bill Ratchford and Nick Vivian (814-696-7197)
Bridge Superstructure Replacement - The project included a two span (106’ – 6” c/c brgs.) Continuous Composite Galvanized Steel I-Beam bridge over the Beaverdam Branch of Juniata River. The project included approximately 400 feet of roadway approach work and utilized a phased construction sequence to maintain traffic throughout construction.