Contact Us

Use the form on the right to contact us.

You can edit the text in this area, and change where the contact form on the right submits to, by entering edit mode using the modes on the bottom right. 

         

123 Street Avenue, City Town, 99999

(123) 555-6789

email@address.com

 

You can set your address, phone number, email and site description in the settings tab.
Link to read me page with more information.

Projects

SPK Engineering's past projects

Filtering by Category: WVDot

CR 16 Crooked Creek Bridge

Michael Kilgore

Cost: $2.7 million
Client: WVDOH
Contact: Patrick Brennan, P.E. (304-414-6418)
Client: WVDOH

CR 16 Crooked Creek Bridge
- Mason County, WV - The bridge replacement was built to match the horizontal curvature of the new roadway alignment. The bridge utilized a galvanized curved steel plate girder superstructure and is supported by semi-integral abutments that are not skewed (radial). The new bridge cross-section provided two (2) 11’-0” travel lanes and two (2) 4'-0" shoulders, along with 32” tall Type F barriers. The bridge width is 30'-0" curb-to-curb and the overall out-to-out is 32'-6". New roadway was constructed on both sides of the proposed structure to allow for a proper tie-in to the existing roadway. Approximately 350’ of roadway was constructed to the west of the structure to tie-in at Station 28+50.00 and approximately 300’ of roadway was constructed to the east of the structure to tie-in at Station 35+75.00.

Crooked Creek Bridge - CR 16 - Mason County

Michael Kilgore

 Cost: $2.7 million
Client: WVDOH
Contact: Patrick Brennan, P.E. (304-414-6418)
Project Construction: Estimated 2023

CR 16 Crooked Creek Bridge - Mason County, WV - The proposed bridge replacement will be built to match the horizontal curvature of the new roadway alignment. The bridge will utilize a curved steel plate girder superstructure and will be supported by semi-integral abutments that will not be skewed (radial). The new bridge cross-section will provide two (2) 11’-0” travel lanes and two (2) 4'-0" shoulders, along with 32” tall Type F barriers. The bridge width will be 30'-0" curb-to-curb and the overall out-to-out will be 32'-6". New roadway will be constructed on both sides of the proposed structure to allow for a proper tie-in to the existing roadway. Approximately 350’ of roadway will be constructed to the west of the structure to tie-in at Station 28+50.00 and approximately 300’ of roadway will be constructed to the east of the structure to tie-in at Station 35+75.00.

This project won 2nd place
2022 DOH Engineering Excellence Awards