Contact Us

Use the form on the right to contact us.

You can edit the text in this area, and change where the contact form on the right submits to, by entering edit mode using the modes on the bottom right. 

         

123 Street Avenue, City Town, 99999

(123) 555-6789

email@address.com

 

You can set your address, phone number, email and site description in the settings tab.
Link to read me page with more information.

Projects

SPK Engineering's past projects

Filtering by Tag: Precast Box Culvert

S.R. 3026 Section B02

Michael Kilgore

Project Cost: $1.3 million
Client: Allison Park Contractors, Inc. / Engineering District 11-0
Contact: Ms. Cheryl Solosky, P.E.
Project Letting – November 2016

Beaver County- The project consists of the replacement of the existing single span steel I-beam bridge carrying SR 3026 (Gas Valley Road) over Branch of South Fork of Tomlinson Run with a precast concrete box culvert.   Minor approach roadway work was also part of the design-build contract. 

S.R. 4002 Section A02/A03

Michael Kilgore

Cost: $1.275 million
Client: Engineering District 2-0
Contact: Mr. Craig Sattesahn, P.E. (814-765-0678)
Project Letting - 2011

Structure Replacements - This project included the replacement of two (2) existing bridges with a prestressed concrete spread box beam bridge (69’ span - Section A02) with integral abutments, and a precast concrete box culvert (24’ span - Section A03). The projects also included 400’ and 515’ of roadway reconstruction for Sections A02 and A03 respectively. 
 

S.R. 0366 Section F01

Michael Kilgore

Project Length: 225'
Client: PennDOT Engineering District 12-0
Contact: Mr. Ron Deems

Camp Joanne Bridge - This project includes a 16'-0" x 8'-0" precast box culvert over an unnamed tributary of Pucketa Creek. The project also includes 225' of approach roadway reconstruction.