Contact Us

Use the form on the right to contact us.

You can edit the text in this area, and change where the contact form on the right submits to, by entering edit mode using the modes on the bottom right. 

         

123 Street Avenue, City Town, 99999

(123) 555-6789

email@address.com

 

You can set your address, phone number, email and site description in the settings tab.
Link to read me page with more information.

Projects

SPK Engineering's past projects

Filtering by Tag: Continuous Fabricated Steel Girder Bridge

S.R. 1006, Section 450

Michael Kilgore

After

After

After

After

Cost: $3.04 million
Client: Engineering District 10-0
Contact: Mr. Jason Layman (724-357-7614)
Project Letting: August 2014

Indiana County - This project included the phased total replacement of a deteriorated four span steel girder bridge with inadequate underclearance with a two span continuous fabricated steel girder bridge (230’ total length) with minimal profile grade adjustment. The bridge carries S.R. 1006 (Airport Road) over four lanes of S.R. 0119. The project also included 370’ of approach roadway reconstruction.